lead flashing chart
The Lead Lads

Lead Flashing Chart

Use our lead flashing chart to pick the correct code, width and length for step flashings, abutments and soakers — then order online with fast UK delivery.

Shop the Chart Code Guide Recent projects
#properleadwork

Lead Flashing: Codes & Sizes

Choosing the right flashing starts with the detail and exposure. Most step and abutment flashings use Code 4, with Code 3 for soakers and Code 5 in higher exposure or longer lengths.

  • Code 3 — soakers and light flashings.
  • Code 4 — standard step/abutment flashings.
  • Code 5 — exposed abutments and wider pieces.

Installation tips

Set chase depth correctly, use hall clips (don’t over-nail), and finish with patination oil. Follow LSTA guidance and BS 6915.

Need sizing help?
lead flat roof

Order by Width

Pick 100–300 mm widths for step flashings and abutments; match laps and coursing to masonry.

Open Flashing Chart
lead rolls

Choose the Code

Code 4 suits most flashings; step up to Code 5 for wider or more exposed details.

View Codes 3–5
lead roof with stepped bays

Fixings & Hall Clips

Restrain flashings with hall clips in chases; use compatible copper or stainless nails where specified.

Shop Fixings
lead welding

Underlay & Movement

Use the correct separating membranes and allow for thermal movement in longer runs.

Shop Underlays
vented lead flat roof

Soakers

Lightweight Code 3 soakers sized to tile/slate gauge; maintain minimum lap and side cover.

Browse Soaker Options
Lead Box Gutter Detail - theleadlads.co.uk

Patination & Finish

Finish flashings with patination oil for clean runoff and a professional finish.

Shop Accessories
#properleadwork

Lead Supply & Procurement

Materials only or supply-and-install — we’ll help you specify the right sizes from the lead flashing chart.

Order to BS EN 12588 and install to BS 6915 and LSTA guidance. Our chart links straight to widths, codes and matched fixings.

Get in touch
leadwork

1 Springwell Court, Tingley
Wakefield, West Yorkshire, WF3 1BZ

hello@theleadlads.co.uk

All rights reserved

Summer Lead Roof Maintenance Guide | Heat, Expansion & Flashing Checks

The Lead Lads ® Lead Roof Guide Summer Maintenance Summer Lead Roof Maintenance Guide Summer [...]

The Lead Lads ® Launch UK Franchise Model to Raise Standards in Specialist Leadwork

Latest News The Lead Lads® Launch UK Franchise Model A controlled expansion designed to professionalise [...]

#Proper Leadwork: Spring Lead Roof Inspections—How to Spot Movement, Fatigue & Failure After Winter

The Lead Lads ® Lead Roof Guide Spring Inspection Spring Lead Roof Inspections — How [...]

Lead Roof Ventilation & Condensation: Warm vs Cold

#Proper Leadwork: Lead Ventilation & Condensation—Warm vs Cold Roof Strategies Interstitial condensation is one of [...]

Lead Ridge & Verge Detailing: Ridges, Verges & Abutments

#Proper Leadwork: Edge-to-Edge Detailing—Ridges, Verges & Abutments without Stress Ridges and verges frame the roofline. [...]

Lead Upstands & Drips: Heights & Edge Geometry

#Proper Leadwork (2026): Upstands & Drips—Heights, Throatings & Edge Geometry Welcome to the New Year [...]

Lead Soakers: Sizing, Gauges & Interfaces

#Proper Leadwork: Lead Soakers—Sizing, Gauges & Interfaces with Slate and Tile Discreet but essential, lead [...]

Lead Cappings to Masonry: Cornices & Cills

#Proper Leadwork: Cornices, Cappings & Cills—Fixing to Masonry without Cracks Beautiful façades deserve durable lead [...]