Specialist curved leadwork to a Grade II listed property in York, incorporating Code 5 gutter linings, bay coverings, timber core rolls, expansion joints, outlets, cornice details and traditional flashings.

RATHBONE HOUSE · YORK · GRADE II LISTED · CURVED LEADWORK

Explore the Project

01 — THE PROJECT

Curved leadwork to a listed York property

At Rathbone House on Tadcaster Road, York, The Lead Lads® undertook specialist renewal of the leadwork to one of the building’s distinctive curved front bays.

The Grade II listed property, formerly known as Moorlyn, dates principally from the nineteenth century. Its curved bays form an important part of the architectural composition of the principal elevation.

The project therefore required more than straightforward weatherproofing. New gutter linings, bay coverings, flashings, outlets, rolls and cornice details had to follow the existing curved geometry while preserving the proportions and character of the frontage.

LEADWORK IN YORK →
SPECIALIST LEADWORK →
LEADWORK STANDARDS →

LOCATION

York

PROGRAMME

Approx. 5 Days

LEAD CODE

Code 5

DESIGNATION

Grade II Listed

02 — THE CHALLENGE

Weathering a complex curved architectural feature

The existing leadwork had deteriorated to the point where comprehensive renewal provided the appropriate long-term solution.

Curved bays are technically more demanding than simple flat lead coverings. Gutters, outlets, rolls, flashings, cappings and cornice details converge within one prominent feature, while the geometry itself introduces additional complexity during setting out and formation.

The leadwork also sits prominently within the principal elevation of a listed building. Technical performance therefore had to be achieved without compromising the architectural form of the bay.

Key considerations

  • Complex curved geometry
  • Existing listed-building fabric
  • Lead movement and expansion
  • Gutter falls and water discharge
  • Outlet positioning
  • Curved rolls and perimeter details
  • Prominent architectural appearance

03 — TECHNICAL APPROACH

Movement, drainage and geometry

The new leadwork was designed around three fundamental requirements: accommodating thermal movement, providing reliable drainage and accurately following the curved form of the existing building.

Code 5 rolled lead sheet was used across the principal new details, with T-Pren expansion joints incorporated within the gutter linings to assist with movement control.

Bossing and welding allowed the material to be formed around the more complex changes in geometry, while timber core rolls established the shape and support required beneath the finished covering.

BS 6915 Leadwork →
The Lead Handbook →
Lead Roofing Guides →
Historic England Listing →

Existing Detail

The original curved bay before renewal of its lead coverings and drainage details.

Formation

Curved substrate, core rolls and leadwork carefully formed around the geometry of the bay.

leadwork prices

Completed Leadwork

Code 5 lead follows the curved frontage while providing a complete weathering system.

04 — PREPARATION + FORMATION

Preparing the curved bay

  • Existing defective lead details carefully stripped where renewal was required
  • Curved bay structure and supporting areas prepared for new work
  • Existing abutments, cornice lines and outlet positions checked
  • Timber supports prepared to follow the curved geometry
  • Wood core roll details formed to suit the profile
  • Fixing backgrounds checked and prepared
  • Gutter falls established to encourage positive drainage
  • Outlet positions coordinated with the existing rainwater arrangement
  • Works sequenced to protect the listed building fabric

05 — LEADWORK INSTALLATION

Curved Code 5 leadwork

  • New Code 5 lead gutter linings installed
  • T-Pren expansion joints incorporated to manage thermal movement
  • New Code 5 lead flashings formed to masonry abutments
  • Curved bay coverings formed around wood core rolls
  • Perimeter welted cappings formed to the bay
  • Cornice details completed with defined drip edges
  • New lead outlets formed and connected to the drainage system
  • Lead bossing used to form curved and complex junctions
  • Lead welding used where required to complete robust details
  • Patination oil applied following completion

CODE 5 LEAD →
LEADWORK FIXINGS →
SHOP LEAD MATERIALS →

06 — SIGNATURE DETAIL

Following the curve

The defining feature of this project is the geometry itself. Unlike a conventional rectangular bay, the lead covering, gutter and perimeter details follow a continuous curved frontage.

This places greater emphasis on accurate setting out and traditional leadworking techniques. Core rolls must follow the architectural line, sheet must be dressed without introducing excessive stress, and outlets and joints must function within a non-linear arrangement.

The completed leadwork therefore becomes both a weathering system and part of the architectural expression of the building.

07 — MATERIALS

Materials selected for movement and form

  • Code 5 rolled lead sheet
  • Timber core rolls
  • Copper ringshank nails
  • Copper fixing strip
  • T-Pren expansion joints
  • Lead-compatible sealant
  • Patination oil

ROLLED LEAD SHEET →
LEADWORK FIXINGS →
LEAD SIZING + ORDERING CHART →

08 — LEADWORK SKILLS

Specialist craft in practice

Curved architectural leadwork brings together several traditional skills within a single detail.

  • Lead bossing
  • Lead welding
  • Setting out curved sheet
  • Forming wood core rolls
  • Welted perimeter cappings
  • Gutter lining and expansion detailing
  • Forming lead outlets
  • Cornice and drip formation
  • Masonry abutment flashings

EXPLORE LEADWORK SERVICES →

09 — PROJECT RECORD

Before.
During.
Completed.

The photographic record shows the condition of the curved bay before work, the formation of the replacement leadwork and the completed architectural detail.

For specialist work of this type, the construction-stage photographs are particularly valuable: they reveal the setting out, support and formation hidden beneath the finished surface.

10 — THE BUILDING

Rathbone House, Tadcaster Road

Rathbone House, formerly Moorlyn, is a Grade II listed property on Tadcaster Road in York.

The building’s curved front bays are amongst the features that give the principal elevation its distinctive character. Renewal of the leadwork therefore needed to respect the existing geometry rather than simplify or visually alter the feature.

Projects of this type demonstrate the role traditional lead sheet continues to play in conserving historic building fabric: it is sufficiently malleable to follow complex architectural forms while providing a durable weathering layer when correctly detailed.

Historic England Listing →

11 — TECHNICAL KNOWLEDGE

Standards and guidance behind the work

The performance of architectural leadwork depends on correct material selection, sheet sizing, fixing, movement allowance and workmanship.

Leadwork Standards →
The Lead Handbook →
Lead Roofing Guides →
Lead Flashing →
Rolled Lead Sheet →

12 — WHAT THIS PROJECT SHOWS

Curved leadwork is a complete system

Successful curved leadwork depends on far more than dressing sheet around a radius.

The gutter linings, outlets, expansion provision, core rolls, cappings, cornices and abutment flashings must work together while following the geometry of the underlying building.

This project demonstrates why curved architectural leadwork remains a specialist discipline: water management, material movement and visual appearance all have to be resolved simultaneously.

PROPERTY OWNER TAKEAWAYS

  • Curved leadwork is technically more demanding than simple flat details.
  • Gutters and outlets are fundamental parts of the overall bay design.
  • Expansion provision helps manage repeated thermal movement.
  • Bossing and welding are important when forming complex geometry.
  • Listed buildings require technical performance and architectural sensitivity.

13 — FREQUENTLY ASKED

Curved lead bay questions

What lead is typically used on a curved bay?

Code 5 lead is commonly used for many fully supported architectural details of this type, although the correct lead code and sheet arrangement depend on the dimensions, geometry and exposure of the individual project.

Why are expansion joints important in lead gutters?

Lead expands and contracts as temperatures change. Where gutter dimensions or geometry require it, correctly specified expansion provision can help accommodate this movement and reduce stress within the sheet.

Why does curved leadwork require specialist skills?

Curved features often combine gutters, rolls, cappings, outlets, flashings and changes in geometry. Accurate bossing, welding, dressing and setting out may all be required to complete these details successfully.

14 — MATERIALS + RESOURCES

From project detail to material supply

The Lead Lads® project archive connects completed specialist leadwork with the materials and technical information used throughout the trade.

Lead Roofing Projects →
Leadwork Services →
Lead Sizing + Ordering Chart →
Rolled Lead Sheet →
Leadwork Fixings →
Lead Lads Shop →

THE LEAD LADS® / PROJECT ARCHIVE

Real projects. Traditional leadwork. Technical knowledge in practice.

Rathbone House forms part of The Lead Lads® project archive documenting lead roofs, curved bays, gutters, valleys, flashings, canopies and traditional architectural leadwork.

The archive records real materials, detailing, problems and construction methods — connecting specialist craftsmanship with technical guidance and the products used to deliver the work.