The Property
Custom Lead Chute Detail – York, North Yorkshire
This project involved the formation of two custom lead chute details to a single ply flat roof on a private residential dwelling on the outskirts of York. The main flat roof covering was completed by GNR Roofing Services, with The Lead Lads engaged to provide the specialist lead outlet details.
Although the leadwork element was relatively small, the detailing was important. Flat roof outlets and chutes are critical points in any rainwater system because they must move water away from the roof covering quickly and safely. Poorly formed outlet details can lead to standing water, staining, overflow, edge failure or moisture tracking back into the roof build-up.
The finished details were formed using Code 5 rolled lead sheet and 3mm stainless steel sheet metal to create a robust discharge point from the flat roof. The lead was dressed and welded to suit the outlet arrangement, creating a clean, durable and purpose-made chute detail.
Why a Custom Lead Chute Was Needed
The main roof area was formed in single ply, but the outlet points required a more bespoke and durable solution. Standard outlet trims are not always suitable where the roof edge, fall direction and drainage route need a purpose-made detail. In this case, two custom lead chutes were formed to help manage water discharge from the flat roof.
Lead is well suited to this type of outlet work because it can be dressed, shaped and welded around complex junctions. When combined with a rigid stainless steel former, it provides a strong and tidy detail that can deal with water flow, movement and exposure at the roof edge.
Leadwork Standards and Technical Approach
This project was completed using a standards-led approach focused on accurate outlet formation, robust material selection and clean integration with the surrounding flat roof system.
- BS 6915 informed the lead sheet detailing and fixing approach.
- BS EN 12588 governed the rolled lead sheet material specification.
- Lead Sheet Association guidance informed welding, dressing, fixing and outlet detailing principles.
The key principle with a lead chute is that the detail must guide water away cleanly without creating weak points at the roof edge. The chute must be rigid enough to hold its form, dressed neatly into the surrounding roof area and detailed so that water cannot track behind the leadwork.
Contact us about leadwork More leadwork resources and guides The leadwork LinkSpecification of Works
Preparation and Removal
- Flat roof outlet positions reviewed before lead chute formation.
- Drainage route and discharge points checked against the single ply roof layout.
- Working areas prepared around the roof edge and outlet positions.
- Stainless steel former requirements confirmed for each chute detail.
- Leadwork set out to suit the outlet size, edge position and water flow direction.
Substrate and Support
- Outlet zones prepared to receive the custom chute details.
- 3mm stainless steel sheet metal used to provide a strong former beneath the lead.
- Lead support and edge details aligned with the surrounding flat roof system.
- Fixing positions prepared to allow secure installation without compromising water flow.
Leadwork Installation
- Two custom lead chute details formed to suit the flat roof outlet positions.
- New chute coverings formed using Code 5 rolled lead sheet.
- Lead dressed over the stainless steel former to create a rigid discharge detail.
- Welded joints formed where required to maintain continuity through the chute.
- Lead flashings dressed neatly into the surrounding outlet area.
- Copper nails used in suitable locations for secure and compatible fixing.
- Chute edges formed to encourage clear discharge away from the roof.
- Finished details checked for alignment, water flow and weathering performance.
Finishing and Protection
- All welded and dressed leadwork checked on completion.
- Outlet areas cleaned down following installation.
- Completed chute details inspected for water discharge, fixing security and finish.
The Materials
This project used a small but important group of specialist materials, selected to create strong and durable lead outlet details from the flat roof.
- Code 5 lead
- 3mm stainless steel sheet metal
- Copper nails
- Lead welding materials
- Lead-compatible fixing materials
If you are trying to understand which code of lead is right for a similar detail, our shoppable lead chart is a useful starting point. For broader product learning, see The Lead Handbook and our lead roofing guides.
The Lead & Materials Used By Us 🛒 Lead Weight Calculator
Skills Required
- lead welding
- lead dressing
- lead flashing
- forming custom outlet details
- working with stainless steel formers
What This Project Teaches About Lead Outlet Details
Small roof drainage details can have a major effect on the performance of a flat roof. The main covering may be single ply, liquid-applied or another system, but the outlet still needs to move water away reliably. A weak chute or poorly formed discharge point can quickly become the place where water stands, tracks or causes staining below.
This project shows why bespoke leadwork is often needed at roof edges and outlets. By forming a custom chute in Code 5 lead over a stainless steel former, the detail became stronger, cleaner and better suited to the specific roof layout than a standard off-the-shelf trim.
Property Owner Takeaways
- Flat roof outlets need careful detailing to prevent water tracking and overflow.
- Custom lead chutes can be formed to suit awkward roof edges and discharge points.
- Stainless steel formers can add rigidity to exposed outlet details.
- Even small lead details should be properly dressed, welded and fixed.
Related Lead Lads Resources
- Lead roofing projects
- Leadwork standards hub
- Leadwork services
- Shoppable lead chart
- Lead roll
- Leadwork fixings
Frequently Asked Questions
What is a lead chute detail?
A lead chute is a formed outlet detail that helps discharge water away from a flat roof or gutter area.
Why use lead for a roof chute?
Lead can be dressed, welded and shaped to create a durable outlet detail that suits the exact roof layout.
Why was stainless steel used beneath the lead?
The stainless steel sheet provided a rigid former, helping the chute hold its shape and resist damage.
What code of lead was used?
Code 5 lead was used because it provides a robust material choice for this type of exposed outlet detail.
Can lead be used with single ply roofing?
Yes, but the junction must be designed carefully so both systems integrate correctly and manage water effectively.
Where can I buy lead outlet materials?
You can explore lead roll, fixings and leadwork guides through the Lead Lads Shop.