18 — FREQUENTLY ASKED
Complex leadwork questions
What leadwork was completed at Rathbone House?
The project included a central lead roof, twelve valleys, two front dormers, hips, ridges, six pediments, bay-window coverings, internal outlets, additional drainage channels and bespoke lead hopper heads.
Was The Lead Lads project part of a larger roof restoration?
Yes. The specialist leadwork formed part of a much wider Grade II roof refurbishment delivered by Neal Roofing, including the main slate roof areas and associated restoration works.
Why are bespoke lead hoppers useful?
A purpose-made hopper can be shaped around the architecture and actual drainage arrangement rather than forcing a standard component into a complex roof interface.
How much roof drained towards the new hopper details?
The wider project involved bespoke hopper arrangements associated with approximately 350m² of new Welsh slate roofing.
What lead code was used?
Code 5 lead was used extensively across the main roof details and valleys, with Code 4 used for suitable project-specific applications. The correct code depends on the individual detail and sheet dimensions.
Why were the hips and ridges formed in lead?
Lead over timber rolls provided a traditional method of weathering those roof junctions while allowing the details to integrate with the wider leadwork package.
Can lead protect decorative architectural elements?
Yes. Appropriately detailed lead can weather dormer cheeks, timber features, pediments, bay roofs, cappings and many other complex architectural forms.