Leadwork can provide an exceptionally durable roof covering, flashing or weathering detail, but only when it is designed and installed correctly.
Incorrect bay sizes, poor fixings, inadequate substrates, missing ventilation, poor laps, overlong sheets and badly formed junctions can all lead to premature failure.
These guides explain how professional leadwork should be approached. They are not basic DIY instructions. They are intended to help clients, specifiers, surveyors and contractors understand the difference between proper leadwork and short-term remedial work.
Lead Roofing and Roof Build-Ups
A lead roof is more than the visible sheet covering. The complete build-up can include supporting joists, insulation, vapour control layers, ventilation pathways, suitable decking, separation layers, wood rolls, drainage falls, outlets and perimeter details.
The precise arrangement will depend on whether the roof is warm, cold or uninsulated, as well as the form and age of the building. Our guides explain how these elements interact and why deficiencies beneath the lead can affect the finished roof.
Lead welding joins sheets and fabricated components to form durable seams, corners, outlets, sumps and complex junctions.
Lead Bossing
Lead bossing is the traditional process of shaping sheet lead without unnecessary cutting. It is particularly valuable around corners, rolls, outlets and complex roof junctions.
Perimeter Edge Details
Drips, welts, rolls, clips and abutments must shed water while allowing the lead to move naturally as temperatures change.